Evanston, IL · 40°F Mostly Cloudy Submit a Tip · Corrections · Advertise · Contact
Wednesday, November 25, 2026Evanston · Wilmette · Skokie · Winnetkaevanstonedge.com

Evanston’s Dog Beach still closes Dec. 1, after a council vote to keep it open didn’t count

Council members voted 7-2 to keep the beach open through December, but the item wasn't on the agenda. The ADA ramp contract is valued at $863,850.

By Rachel Lindqvist · 2 min read
·

Dog owners on Evanston's Dog Beach in winter. Photo: Jaysin Trevino from Evanston, IL, US / Wikimedia Commons, CC BY 2.0

Evanston’s Dog Beach is still set to close Tuesday, Dec. 1, even though a majority of the City Council voted Monday night to keep it open through the end of the year.

Council members voted 7-2 on Nov. 23 to direct staff to leave the beach open until Dec. 31, Evanston Now reported. But the item was not on the posted agenda, and Corporation Counsel Alex Ruggie told members the change would have to come back as a listed agenda item at a later meeting before it could take effect. Until then, Ruggie said, the Dec. 1 closure stands.

The vote can be watched in the video of the meeting. Ald. Clare Kelly (1st) was joined in voting yes by Alds. Shawn Iles (3rd), Bobby Burns (5th), Tom Suffredin (6th), Parielle Davis (7th) and Matt Rodgers (8th) and Acting Mayor Jonathan Nieuwsma (4th). Ald. Krissie Harris (2nd) and Ald. Juan Geracaris (9th) voted no. Harris, who raised the question about the council’s authority, said the city had made “the right legal choice to close the beach,” according to Evanston Now.

Why the beach is closing

The city’s position is laid out on its Dog Beach ADA page. Under the Americans with Disabilities Act, the city says, the beach’s current entrance and access route do not give people with disabilities the access the law requires. The temporary entrance the city built to reopen the beach in late 2022, after high lake levels in 2019 and 2020 submerged the beach and wrecked the old concrete paths, was never ADA-compliant.

The fix has been slow and expensive. The city’s timeline lists a 2024 construction bid of $693,577 from John Keno & Company that expired before the council acted, a round of value engineering in 2025, and a design-build request for proposals in May 2026 that drew one response. The recommended design-build contract with John Keno is valued at $863,850, with engineering and permitting through February 2027 and construction in summer 2027. It would add a permanent ramp, an accessible landing, a gated enclosure and an accessible dog wash.

Council members rejected the ramp priced at more than $800,000 earlier this year, Evanston Now reported, and Kelly has argued that a cheaper option is possible. City Manager Luke Stowe told the council Monday that staff is working with Kelly on a new request for proposals to go out by the end of the year, with a contract he hoped to award in February and a reopening by summer.

What happens next

The council’s next regular meeting is Dec. 14, when it also takes up the 2027 budget and property tax levy that were held over Monday. A special meeting on Dec. 7 was discussed but not scheduled, Evanston Now reported. If one is called, Ruggie said the dog beach item could be added to it.

The beach sits beside the Church Street boat launch. After Dec. 1, the city is pointing dog owners to its other off-leash areas: Dog E-Town at Grey Park, 1051 Main St., and Pooch Park. Access requirements, hours and rules are posted on the city’s dog park page.

For background, see our Nov. 3 story on the closure and rebid, our guide to Evanston’s beaches, the budget amendments that were on the table Monday and the next parks in line for renovation. More is on our Neighborhoods page.

Add The Evanston Edge as a preferred source on Google (opens in a new tab)

Rachel Lindqvist covers community life, the lakefront, dining and the arts for The Evanston Edge.

More Local News